Back
Olympic Property ASSET
ASSET DESCRIPTION
ASSET DESCRIPTION
Overview
Contained Material
Operations
Fleet
Energy
Economics
Access to Property
ASSET NAME
Olympic Property
ASSET TYPE
Exploration
Exploration METALS & MINERALS
Gold, Silver
SPECIFIC LOCATION
Bralorne, BC, Canada
CURRENT ASSET STATUS
  • Drilling
HISTORICAL OWNERSHIP
OWNERSHIPFROMTOCOMMENT
MINERAL RESOURCES AND RESERVES
Mineral Resources:
MetalMeasuredIndicatedInferredAttributable interests
TonnageGradeContainedCutOffTonnageGradeContainedCutOffTonnageGradeContainedContained
Gold 0 k mt 0 g/t 0 k oz 0 g/t 0 k mt 0 g/t 0 k oz 0 g/t 0 k mt 0 g/t 0 k oz 0
Silver 0 k mt 0 g/t 0 m oz 0 g/t 0 k mt 0 g/t 0 m oz 0 g/t 0 k mt 0 g/t 0 m oz 0
Mineral Reserves:
MetalProvenProbableAttributable interests
TonnageGradeContainedCutOffTonnageGradeContainedCutOffContained
Gold 0 k mt 0 g/t 0 k oz 0 g/t 0 k mt 0 g/t 0 k oz 0 g/t 0
Silver 0 k mt 0 g/t 0 m oz 0 g/t 0 k mt 0 g/t 0 m oz 0 g/t 0
TOTAL CASH COST PER GOLD OUNCE
Amount in millionsMiningProcessingAdminRoyaltiesTotal%
Fuel000000 %
Maintenance000000 %
Labour000000 %
Insurance000000 %
Royalities000000 %
Reagents000000 %
Explosives000000 %
Contractors/consultants000000 %
Other*000000 %
Total US$ millions000000 %
PRODUCTION
PRODUCTION CYCLE Annual 2026 Experiences Expectations
2025 Q1 Q2 Q3 Q4 2026 5 Year Avg Remaining LOM
Capital Expenditures 0 0 0 0 0 0 0 0
Ore Tons Mined 0 0 0 0 0 0 0 0
Mill Feed - Ore Tons Processed 0 0 0 0 0 0 0 0
Gold (k oz) Produced 0 0 0 0 0 0 0 0
Silver (m oz) Produced 0 0 0 0 0 0 0 0
Gold (k oz) Sold 0 0 0 0 0 0 0 0
Silver (m oz) Sold 0 0 0 0 0 0 0 0
Gold Recovery (%) 0 0 0 0 0 0 0 0
Silver Recovery (%) 0 0 0 0 0 0 0 0
Cash Operating Cost 0 0 0 0 0 0 0 0
All - in Sustaining Costs 0 0 0 0 0 0 0 0
Strip Ratio – Waste:Ore 0 0 0 0 0 0 0 0
ARTICULATED HAULERS
US METRIC
TRUCKSNo. OF TRUCKSNET POWER (HP)LOAD CAPACITY (tons)
MINING TRUCKS
US METRIC
TRUCKSNo. OF TRUCKSNET POWER (HP)LOAD CAPACITY (tons)
POWER DEMAND
ENERGY SOURCEENERGY TYPEAVAILABLE POWER (MW)US$ PER KWHCONTRACT #EXPIRATION DATE
POWER AND ENGINEERING
Power Usage: total MWh per year
Peak power demand MW
Environmental Impact Assessment, man hours
Engineering firms
Local firms
AFTER TAX & ROYALTY NET PRESENT VALUE
Initial Capital Cost Operating Expenses NVP Discount RatePayback periodAfter tax IRRGold (oz)Silver (oz)
Date of Assessment
Oct 18, 2026